This Sample Will Let You Know About
- Value engineering the design at RIBA stage 4
INTRODUCTION
Value engineering refers to the systematic approach that has been prepared in order to make the project highly organized to provide significant functions into the project at very low cost (Pilanawithana and Sandanayake, 2017). It is the concept that promotes substitution of materials as well as methods that are less expensive in nature without sacrificing the functionality and also called as value evaluation. This report will highlight the value engineering designing at RIBA stage 4 in which certain measures will be discussed in order to reduce the costs in effectual manner. Want to get Assignment help? Talk Our Expert Now!
Value engineering the design at RIBA stage 4
RIBA illustrates the sector standard planning methods that describes each and every step of the overall procedure in a construction, designing and building projects. It stands for Royal Institute of British Architects In the UK and across the world who publishes the plan of work namely as RIBA. This helps architects to construct a process of designing, briefing, construction, operations and utilization of building projects. The plan of work under this specific system conclude all the tasks and results that are required at key stages of the project. The lists describe all the tasks and output that are extremely required at key stages of the assignment. It is highly utilized construction company document within the UK and based upon a constructive model for the overall building procedure. Stuck on Psychology assigenmnt consider seeking help from our experts Psychology Assignment Help at the best price.
The stages that are involved within the RIBA plan of work at stage 4 consists of following stages such as technical designing according to which the building services, architectural as well as the structural practical application designs has been illustrated in detailed manner. Under such kind of specific stage, technical designs are developed by any specialists and their sub contractions will be evaluated in highly acknowledged manner. At this specific stage certain modifications takes place that greatly affects the cost behaviour of the overall project (Casoni and et.al., 2020). This modification greatly emphasize and provide implications over the value engineering principles that plays a major role in the concerned project such as Querry House Conference and community centre in context of making some appropriate and desirable modifications that are required within the designing and operational methods that helps to raise the effectiveness of the complete assignment that also works over the cost saving factor of the project.
Value Engineering proposal acts as one of the vital change idea that would lead towards the adoption of changes into the proposal and planning of design in highly effectual manner. This is considered as one of the important aspect of RIBA stage at fourth level because it helps the project to minimize the cost and other expenses in context of making changes into the designing of the construction project as well as other working methods.
According to the new and advanced cost saving proposal, certain modifications has been done which illustrates the cost saving aspect below:
Element |
Total cost |
Cost per unit or meter square |
Element unit quantity |
Element unit rate |
Percentage |
Bamboo fibre frame |
22598 |
£62 |
|||
Asphalt Shingles |
436581 |
£120 |
|||
Extruded brick |
4000 |
£1 / brick |
In the similar way, the cost of fittings and furnishings which is the major part of the project i.e. 49% of the overall budget. Hence, in order to reduce with a medium of taking changes in the Querry House Conference and community centre, the manager have adopts alternative solution by adopting Extruded brick which costs nearly £1 / brick that helps the complete project in order to reduce the overall monetary fund in highly considerable manner (Kirwan and Rogers, 2020).
According to the above prepared changes, it has been evaluated that various elements in relation to finish the project, the substitute items greatly affects and arrange changes in highly considerable manner. The changes are considered to be implemented in positive manner because it reduces the overall costing of the project that can be utilized in some another aspect such as designing, interior, etc. which helps to modify the project in effective ways. Want to get Economics Assignment Help? Talk Our E